Project Name: Andersonville Replacements of 3 Roofs
Client: Dept. of Interior/National Park Service
Project Status: Complete
Project Description: This project consisted of the replacement of roofs on the Historical Structures of the Curatorial, Maintenance, and Pump Buildings as well as grinding and resealing concrete surfaces for proper drainage. We are using the ECOSTAR product with Majestic faux slate shingles along with ECO vent ridge venting. These materials were recommended since they offer an environmentally, lightweight alternative to traditional slate roofing manufactured from 80% post-industrial recycled rubber and plastic. Majestic Slate tiles provide enhanced resistance to harsh weather conditions including wind, driving rain and hail. All work was performed while the facility continues to receive over 500-700 visitors daily. Safety of the guests and personnel was paramount. Safety measures were taken throughout the projects with no incidents reported.